Permits
Onsite Wastewater Treatment Facilities: Permits
Most onsite wastewater systems in Nebraska are constructed under “Authorization by Rule” which does not require a construction permit from the State of Nebraska. However, some systems will require a permit as a result of the quantity or quality of the wastewater generated or site conditions that do not meet “Authorization by Rule” requirements.