Generating Units in Nebraska
The units generating electricity are listed in the table below, each with unit ID, capacity, prime mover, energy source, year of commercial operation, status, number of wind turbines if applicable, and the generation sector. The key to the abbreviations is below the table.
While individual installations are not reported in available net metering reports for Nebraska, the assumption was made that small–scale projects are in the net metering reports. So megawatts from the net metering reports are included in the totals below while megawatts from the known small–scale projects are not included in the totals to avoid possible double–counting.
See the Units and Capacity by Energy Source and Year of Initial Operation report and the Units and Capacity by Energy Source report for additional information.
A Note About Nameplate Capacity
Summer capacity and winter capacity is sometimes greater than nameplate capacity. The nameplate gives the capacity rating of the generator when it operates at certain temperatures, pressures, and power factors. With some modifications and with some margins that are built into generators, it is possible to exceed its nameplate. It is not uncommon for a generator to exceed its nameplate. The nameplate is usually not replaced and, in this case, the summer and winter capacity is often much higher than the nameplate value. Normally, summer and winter capacity is expected to be below nameplate capacity and in most cases they are.
Generating Units in Nebraska 2021
Company -Plant (County) | Unit ID | Nameplate Capacity (kW) | Summer Capacity (kW) | Winter Capacity (kW) | Prime Mover 1 | Energy Source 2 | Year of CO | Unit Status 3 | Number of Wind Turbines (Utility–Scale)4 | Sector5 |
---|---|---|---|---|---|---|---|---|---|---|
Nebraska Total | 10,792,813.35 | 10,267,513.35 | 9,985,113.35 | 1,333 | ||||||
Adapture Renewables, Inc. | ||||||||||
–Holdrege Solar Center (Lancaster) | HDSC | 4,000.00 | 4,000.00 | 4,000.00 | PV | SUN | 2016 | OP | — | IPP Non–CHP |
Alliance, City of | ||||||||||
–Net Metered Renewable Installations | 21.57 | 21.57 | 21.57 | NA | NA | 2021 | OP | — | Electric | |
Ansley, City of | ||||||||||
–Ansley (Custer) | 2 | 900.00 | 800.00 | 800.00 | IC | N/DFO | 1976 | OP | — | Electric |
3 | 600.00 | 500.00 | 500.00 | IC | DFO | 1969 | OP | — | Electric | |
Archer Daniels Midland Co. | ||||||||||
–Archer Daniels Midland Columbus (Platte) | GEN1 | 71,400.00 | 61,000.00 | 61,000.00 | ST | S/Bit | 2010 | OP | — | Industrial CHP |
–Archer Daniels Midland Lincoln (Lancaster) | GEN1 | 7,900.00 | 7,900.00 | 7,900.00 | ST | S | 1988 | OP | — | Industrial CHP |
Arnold, Village of | ||||||||||
–Arnold (Custer) | 1 | 500.00 | 500.00 | 500.00 | IC | DFO | 1960 | SB | — | Electric |
2A | 100.00 | 100.00 | 100.00 | IC | DFO | 1937 | OS | — | Electric | |
3 | 200.00 | 200.00 | 200.00 | IC | DFO | 1942 | OS | — | Electric | |
4 | 300.00 | 200.00 | 200.00 | IC | DFO | 1946 | OS | — | Electric | |
Auburn, Board of Public Works | ||||||||||
–Auburn (Nemaha) | 1 | 2,400.00 | 2,200.00 | 2,400.00 | IC | N/DFO | 1982 | OP | — | Electric |
2 | 1,000.00 | 900.00 | 1,000.00 | IC | N/DFO | 1949 | OP | — | Electric | |
4A | 3,700.00 | 3,700.00 | 3,700.00 | IC | N/DFO | 1993 | OP | — | Electric | |
5 | 3,300.00 | 3,000.00 | 3,300.00 | IC | N/DFO | 1973 | OP | — | Electric | |
6 | 2,700.00 | 2,500.00 | 2,700.00 | IC | N/DFO | 1967 | OP | — | Electric | |
7 | 5,600.00 | 5,200.00 | 5,600.00 | IC | N/DFO | 1987 | OP | — | Electric | |
BCSB, LLC | ||||||||||
–Burt County Solar Hybrid (Burt) | 1 | 700.00 | 700.00 | 700.00 | PV | SUN | 2021 | OP | — | IPP Non–CHP |
2 | 700.00 | 700.00 | 700.00 | BA | MWH | 2021 | OP | — | IPP Non–CHP | |
–Dodge County Solar Hybrid (Dodge) | 1 | 700.00 | 700.00 | 700.00 | PV | SUN | 2021 | OP | — | IPP Non–CHP |
2 | 700.00 | 700.00 | 700.00 | BA | MWH | 2021 | OP | — | IPP Non–CHP | |
Beaver City, City of | ||||||||||
–Beaver City (Furnas) | 1 | 500.00 | 400.00 | 400.00 | IC | DFO/N | 1957 | OP | — | Electric |
2 | 300.00 | 300.00 | 300.00 | IC | N/DFO | 1963 | OP | — | Electric | |
3 | 300.00 | 200.00 | 200.00 | IC | DFO | 1947 | OP | — | Electric | |
4 | 900.00 | 800.00 | 900.00 | IC | N/DFO | 1967 | OP | — | Electric | |
BHE Renewables, LLC | ||||||||||
–Grande Prairie Wind Farm (Holt) | 1 | 400,000.00 | 400,000.00 | 400,000.00 | WT | Wind | 2016 | OP | 200 | IPP Non-CHP |
Blue Hill, City of | ||||||||||
–City Light and Water (Webster) | 1 | 900.00 | 900.00 | 900.00 | IC | DFO | 1987 | OP | — | Electric |
2 | 400.00 | 400.00 | 400.00 | IC | DFO | 1987 | OP | — | Electric | |
Bluestem LLC | ||||||||||
–Springview (Keya Paha) | 3 | 1,500.00 | 1,500.00 | 1,500.00 | WT | Wind | 2011 | OP | 1 | IPP Non-CHP |
4 | 1,500.00 | 1,500.00 | 1,500.00 | WT | Wind | 2011 | OP | 1 | IPP Non-CHP | |
Broken Bow, City of | ||||||||||
–Broken Bow (Custer) | 1 | 500.00 | 500.00 | 500.00 | IC | DFO | 1936 | OP | — | Electric |
2 | 3,500.00 | 3,500.00 | 3,500.00 | IC | N/DFO | 1970 | OP | — | Electric | |
3 | 800.00 | 700.00 | 700.00 | IC | DFO | 1945 | OP | — | Electric | |
4 | 800.00 | 700.00 | 700.00 | IC | N/DFO | 1951 | OP | — | Electric | |
5 | 1,000.00 | 1,000.00 | 1,000.00 | IC | N/DFO | 1951 | OP | — | Electric | |
6 | 2,100.00 | 2,000.00 | 2,000.00 | IC | N/DFO | 1961 | OP | — | Electric | |
Broken Bow Wind LLC | ||||||||||
–Broken Bow Wind LLC (Custer) | 1 | 79,900.00 | 79,900.00 | 79,900.00 | WT | Wind | 2012 | OP | 50 | IPP Non–CHP |
Burt County Public Power District | ||||||||||
–Net Metered Renewable Installations | 409.75 | 409.75 | 409.75 | NA | NA | 2021 | OP | — | Electric | |
Burwell, City of | ||||||||||
–Burwell (Garfield) | 1 | 1,300.00 | 1,300.00 | 1,300.00 | IC | DFO | 1972 | OP | — | Electric |
2 | 1,100.00 | 1,100.00 | 1,100.00 | IC | DFO | 1968 | OP | — | Electric | |
3 | 900.00 | 900.00 | 900.00 | IC | DFO | 1960 | OP | — | Electric | |
4 | 600.00 | 600.00 | 600.00 | IC | DFO | 1955 | SB | — | Electric | |
Butler County Public Power District | ||||||||||
–Net Metered Renewable Installations | 147.00 | 147.00 | 147.00 | NA | NA | 2021 | OP | — | Electric | |
Cambridge, City of | ||||||||||
–Cambridge (Furnas) | CAT1 | 2,000.00 | 2,000.00 | 2,000.00 | IC | DFO | 2005 | SB | — | Electric |
CAT2 | 2,000.00 | 2,000.00 | 2,000.00 | IC | DFO | 2005 | OP | — | Electric | |
Campbell, Village of | ||||||||||
–Campbell Village (Franklin) | IC4 | 1,000.00 | 1,000.00 | 1,000.00 | IC | DFO | 1983 | SB | — | Electric |
CCC Hastings Renewable Energy, LLC | ||||||||||
–CCC Hastings Wind Turbine (Adams) | WT1 | 1,700.00 | 1,700.00 | 1,700.00 | WT | Wind | 2016 | OP | 1 | IPP Non–CHP |
Cedar-Know Public Power District | ||||||||||
–Net Metered Renewable Installations | 52.00 | 52.00 | 52.00 | NA | NA | 2021 | OP | — | Electric | |
Central City, City of | ||||||||||
–Central City | 0.20 | 0.20 | 0.20 | PV | SUN | 2015 | OP | — | ||
–Net Metered Renewable Installations | 210.00 | 210.00 | 210.00 | NA | NA | 2021 | OP | — | Electric | |
Central Nebraska Public Power & Irrigation District | ||||||||||
–Jeffrey (Lincoln) | 1 | 10,800.00 | 10,500.00 | 10,500.00 | HY | Water | 1941 | OP | — | Electric |
2 | 10,800.00 | 10,500.00 | 10,500.00 | HY | Water | 1941 | OP | — | Electric | |
–Johnson 1 (Gosper) | 1 | 10,800.00 | 10,000.00 | 10,000.00 | HY | Water | 1941 | OP | — | Electric |
2 | 10,800.00 | 10,000.00 | 10,000.00 | HY | Water | 1941 | OP | — | Electric | |
–Johnson 2 (Gosper) | 1 | 22,500.00 | 22,500.00 | 22,500.00 | HY | Water | 1941 | OP | — | Electric |
–Kingsley (Keith) | 1 | 50,000.00 | 41,000.00 | 41,000.00 | HY | Water | 1984 | OP | — | Electric |
Chappell, City of | ||||||||||
–Chappell (Deuel) | 5 | 1,100.00 | 1,000.00 | 1,000.00 | IC | DFO | 1982 | OP | — | Electric |
Chimney Rock Public Power District | ||||||||||
–Net Metered Renewable Installations | 96.00 | 96.00 | 96.00 | NA | NA | 2021 | OP | — | Electric | |
Consolidated Edison Development Inc. | ||||||||||
–Broken Bow Wind II, LLC (Custer) | BBII | 73,100.00 | 73,100.00 | 73,100.00 | WT | Wind | 2014 | OP | 43 | IPP Non–CHP |
Cornhusker Public Power District | ||||||||||
–Net Metered Renewable Installations | 655.00 | 655.00 | 655.00 | NA | NA | 2021 | OP | — | Electric | |
Cottonwood Wind Project | ||||||||||
–Cottonwood Wind Energy Center (Webster) | CTNWD | 89,700.00 | 89,700.00 | 89,700.00 | WT | Wind | 2017 | OP | 40 | IPP Non–CHP |
Creston Ridge, LLC | ||||||||||
–Creston Ridge Wind Farm (Platte) | WT1 | 6,800.00 | 6,800.00 | 6,800.00 | WT | Wind | 2015 | OP | 4 | IPP Non–CHP |
Creston Ridge II, LLC | ||||||||||
–Creston Ridge II, LLC (Platte) | CR2–1 | 2,300.00 | 2,300.00 | 2,300.00 | WT | Wind | 2017 | OP | 1 | IPP Non–CHP |
CR2–2 | 2,300.00 | 2,300.00 | 2,300.00 | WT | Wind | 2017 | OP | 1 | IPP Non–CHP | |
CR2–3 | 2,300.00 | 2,300.00 | 2,300.00 | WT | Wind | 2017 | OP | 1 | IPP Non–CHP | |
Crete, City of | ||||||||||
–Crete (Saline) | 7 | 6,000.00 | 6,000.00 | 6,100.00 | IC | DFO/N | 1973 | OP | — | Electric |
Crofton Bluffs Wind, LLC | ||||||||||
–Crofton Bluffs Wind LLC (Knox) | CWET1 | 40,000.00 | 40,000.00 | 40,000.00 | WT | Wind | 2012 | OP | 22 | IPP Non–CHP |
Cuming County Renewables, LLC | ||||||||||
–Cuming County Renewables, LLC (Cuming) | T–1 | 2,500.00 | 2,500.00 | 2,500.00 | WT | Wind | 2019 | OP | 1 | IPP Non–CHP |
–Net Metered Renewable Installations | 324.86 | 324.86 | 324.86 | NA | NA | 2021 | OP | — | Electric | |
Curtis, City of | ||||||||||
–Curtis (Frontier) | 2 | 900.00 | 800.00 | 800.00 | IC | N/DFO | 1955 | OP | — | Electric |
3 | 1,100.00 | 1,000.00 | 1,000.00 | IC | N/DFO | 1969 | OP | — | Electric | |
4 | 1,400.00 | 1,200.00 | 1,200.00 | IC | N/DFO | 1975 | OP | — | Electric | |
–Net Metered Renewable Installations | 21.36 | 21.36 | 21.36 | NA | NA | 2021 | OP | — | Electric | |
Custer Public Power District | ||||||||||
–Net Metered Renewable Installations | 117.56 | 117.56 | 117.56 | NA | NA | 2021 | OP | — | Electric | |
David City, City of | ||||||||||
–David City (Butler) | 1 | 1,500.00 | 1,300.00 | 1,300.00 | IC | N/DFO | 1960 | OP | — | Electric |
2 | 1,000.00 | 800.00 | 800.00 | IC | DFO | 1949 | OP | — | Electric | |
3 | 1,000.00 | 900.00 | 900.00 | IC | N/DFO | 1955 | OP | — | Electric | |
4 | 2,300.00 | 1,800.00 | 1,800.00 | IC | N/DFO | 1966 | OP | — | Electric | |
5 | 1,600.00 | 1,300.00 | 1,300.00 | IC | DFO | 1996 | OP | — | Electric | |
6 | 1,600.00 | 1,300.00 | 1,300.00 | IC | DFO | 1996 | OP | — | Electric | |
7 | 1,600.00 | 1,300.00 | 1,300.00 | IC | DFO | 1996 | OP | — | Electric | |
Dawson Public Power District | ||||||||||
–Net Metered Renewable Installations | 335.9 | 335.9 | 335.9 | NA | NA | 2021 | OP | — | Electric | |
Deshler, City of | ||||||||||
–Deshler (Thayer) | 4 | 600.00 | 600.00 | 600.00 | IC | DFO | 1956 | OP | — | Electric |
5 | 1,100.00 | 1,100.00 | 1,100.00 | IC | DFO | 1999 | OP | — | Electric | |
DG Nebraska Energy Storage, LLC | ||||||||||
–South Sioux City Energy Storage (Dakota) | SSCES | 1,500.00 | 1,500.00 | 1,500.00 | BA | MWH | 2020 | OP | — | IPP Non–CHP |
DG Southwest Solar Portfolio 2019, LLC | ||||||||||
–Fort Calhoun Community Solar (Washington) | FTCAL | 5,000.00 | 5,000.00 | 5,000.00 | PV | SUN | 2019 | OP | — | IPP Non–CHP |
Elkhorn Ridge Wind, LLC | ||||||||||
–Elkhorn Ridge Wind LLC (Knox) | 1 | 81,000.00 | 81,000.00 | 81,000.00 | WT | Wind | 2009 | OP | 27 | IPP Non–CHP |
Elkhorn Rural Public Power District | ||||||||||
–Net Metered Renewable Installations | 92.00 | 92.00 | 92.00 | NA | NA | 2021 | OP | — | Electric | |
Emerson, City of | ||||||||||
–Emerson (Dixon) | 2 | 1,100.00 | 1,100.00 | 1,100.00 | IC | N/DFO | 1968 | OP | — | Electric |
3 | 100.00 | 100.00 | 100.00 | IC | DFO/N | 1947 | OP | — | Electric | |
4 | 400.00 | 400.00 | 400.00 | IC | N/DFO | 1960 | OP | — | Electric | |
Fairbury | ||||||||||
–Net Metered Renewable Installations | 50.00 | 50.00 | 50.00 | NA | NA | 2021 | OP | — | Electric | |
Falls City, City of | ||||||||||
–Falls City (Richardson) | 1 | 600.00 | 600.00 | 600.00 | IC | DFO | 1930 | OP | — | Electric |
2 | 900.00 | 900.00 | 900.00 | IC | DFO | 1937 | OP | — | Electric | |
3 | 2,700.00 | 2,300.00 | 2,300.00 | IC | N/DFO | 1965 | OP | — | Electric | |
4 | 1,100.00 | 800.00 | 800.00 | IC | N/DFO | 1946 | OP | — | Electric | |
5 | 2,000.00 | 1,400.00 | 1,400.00 | IC | N/DFO | 1950 | OP | — | Electric | |
6 | 2,500.00 | 2,000.00 | 2,000.00 | IC | N/DFO | 1958 | OP | — | Electric | |
7 | 6,200.00 | 5,900.00 | 5,900.00 | IC | N/DFO | 1972 | OP | — | Electric | |
8 | 6,000.00 | 6,000.00 | 6,000.00 | IC | N/DFO | 1982 | OP | — | Electric | |
9 | 9,300.00 | 9,300.00 | 9,300.00 | IC | N/DFO | 2018 | OP | — | Electric | |
–Net Metered Renewable Installations | 64.75 | 64.75 | 64.75 | NA | NA | 2021 | OP | — | Electric | |
Flat Water Wind Farm LLC | ||||||||||
–Flat Water Wind Farm LLC (Richardson) | WTG1 | 60,000.00 | 60,000.00 | 60,000.00 | WT | Wind | 2010 | OP | 40 | IPP Non-CHP |
Franklin, City of | ||||||||||
–Franklin (Franklin) | 1 | 600.00 | 600.00 | 600.00 | IC | DFO/N | 1963 | OP | — | Electric |
2 | 1,300.00 | 1,300.00 | 1,300.00 | IC | DFO/N | 1974 | OP | — | Electric | |
3 | 1,100.00 | 1,100.00 | 1,100.00 | IC | DFO/N | 1969 | OP | — | Electric | |
4 | 900.00 | 900.00 | 900.00 | IC | DFO/N | 1955 | OP | — | Electric | |
Fremont, City of | ||||||||||
–Lon Wright (Dodge) | 5OT | 40,000.00 | 38,000.00 | 40,000.00 | GT | N/DFO | 2003 | OP | — | Electric |
6 | 16,500.00 | 15,500.00 | 15,500.00 | ST | S/N | 1957 | OP | — | Electric | |
7 | 22,000.00 | 21,000.00 | 21,000.00 | ST | S/N | 1963 | OP | — | Electric | |
8 | 91,500.00 | 82,000.00 | 82,000.00 | ST | S/N | 1976 | OP | — | Electric | |
SLR1 | 1,300.00 | 1,300.00 | 1,300.00 | PV | SUN | 2018 | OP | — | Electric | |
SLR2 | 1,000.00 | 1,000.00 | 1,000.00 | PV | SUN | 2018 | OP | — | Electric | |
CTNWD | 40,900.00 | 40,900.00 | 40,900.00 | WT | Wind | 2017 | OP | 19 | Electric | |
–Net Metered Renewable Installations | 6.45 | 6.45 | 6.45 | NA | NA | 2021 | OP | — | Electric | |
Gering, City of | ||||||||||
–Net Metered Renewable Installations | 69.30 | 69.30 | 69.30 | NA | NA | 2021 | OP | — | Electric | |
Grand Island, City of | ||||||||||
–C W Burdick (Hall) | GT1 | 16,000.00 | 13,600.00 | 14,800.00 | GT | N/DFO | 1968 | OP | — | Electric |
GT2 | 63,400.00 | 34,000.00 | 40,000.00 | GT | N/DFO | 2003 | OP | — | Electric | |
GT3 | 63,400.00 | 34,000.00 | 40,000.00 | GT | N/DFO | 2003 | OP | — | Electric | |
–Platte (Hall) | 1 | 109,800.00 | 100,000.00 | 100,000.00 | ST | S | 1982 | OP | — | Electric |
–Net Metered Renewable Installations | 79.20 | 79.20 | 79.20 | NA | NA | 2021 | OP | — | Electric | |
Hastings, City of | ||||||||||
–Don Henry (Adams) | 1 | 22,000.00 | 18,000.00 | 18,000.00 | GT | N/DFO | 1972 | SB | — | Electric |
–Hastings Community Solar Farm (Adams) | PV | 1,500.00 | 300.00 | 300.00 | PV | SUN | 2019 | OP | — | Electric |
–Net Metered Renewable Installations | 19.00 | 19.00 | 19.00 | NA | NA | 2021 | OP | — | Electric | |
–North Denver (Adams) | 4 | 17,000.00 | 16,000.00 | 16,000.00 | ST | N/DFO | 1957 | SB | — | Electric |
5 | 22,000.00 | 25,000.00 | 25,000.00 | ST | N/DFO | 1967 | SB | — | Electric | |
–Whelan Energy Center (Adams) | 1 | 76,300.00 | 77,000.00 | 77,000.00 | ST | RC | 1981 | OP | — | Electric |
2 | 248,000.00 | 232,000.00 | 232,000.00 | ST | S/RC | 2011 | OP | — | Electric | |
High West Energy, Inc. | ||||||||||
–Net Metered Renewable Installations | 6.00 | 6.00 | 6.00 | NA | NA | 2021 | OP | — | Electric | |
Highline Electric Assoc. | ||||||||||
–Net Metered Renewable Installations | 36.00 | 36.00 | 36.00 | NA | NA | 2021 | OP | — | Electric | |
Holdrege | ||||||||||
–Net Metered Renewable Installations | 132.00 | 132.00 | 132.00 | NA | NA | 2021 | OP | — | Electric | |
Howard Greeley Rural Public Power District | ||||||||||
–Net Metered Renewable Installations | 44.00 | 44.00 | 44.00 | NA | NA | 2021 | OP | — | Electric | |
IGS ORIX Solar I, LLC | ||||||||||
–City of Lexington (Dawson) | LXNE1 | 3,500.00 | 3,600.00 | 1,600.00 | PV | SUN | 2017 | OP | — | IPP Non–CHP |
Invenergy Services LLC | ||||||||||
–Prairie Breeze II (Antelope) | GEN 1 | 73,400.00 | 73,400.00 | 73,400.00 | WT | Wind | 2015 | OP | 41 | IPP Non-CHP |
–Prairie Breeze III (Antelope) | GEN 1 | 35,800.00 | 35,800.00 | 35,800.00 | WT | Wind | 2016 | OP | 20 | IPP Non-CHP |
–Upstream Wind Energy LLC (Antelope) | UWE | 202,500.00 | 202,500.00 | 202,500.00 | WT | Wind | 2018 | OP | 81 | IPP Non-CHP |
KBR Rural Public Power District | ||||||||||
–Net Metered Renewable Installations | 82.40 | 82.40 | 82.40 | NA | NA | 2021 | OP | — | Electric | |
Kimball, City of | ||||||||||
–Kimball (Kimball) | 1 | 1,000.00 | 700.00 | 800.00 | IC | DFO | 1956 | OP | — | Electric |
2 | 1,000.00 | 700.00 | 800.00 | IC | DFO | 1955 | OP | — | Electric | |
3 | 1,300.00 | 1,000.00 | 1,100.00 | IC | DFO | 1959 | OP | — | Electric | |
4 | 1,300.00 | 1,000.00 | 1,100.00 | IC | DFO | 1960 | OP | — | Electric | |
5 | 1,100.00 | 600.00 | 600.00 | IC | DFO | 1944 | OP | — | Electric | |
6 | 3,900.00 | 3,600.00 | 3,700.00 | IC | DFO | 1974 | OP | — | Electric | |
Kimball Wind, LLC | ||||||||||
–Kimball Wind (Kimball) | KIM01 | 30,000.00 | 30,000.00 | 30,000.00 | WT | Wind | 2018 | OP | 12 | IPP Non–CHP |
LaCreek Electric Assoc. Inc. | ||||||||||
–Net Metered Renewable Installations | 25.00 | 25.00 | 25.00 | NA | NA | 2021 | OP | — | Electric | |
Laredo Ridge Wind LLC | ||||||||||
–Laredo Ridge Wind LLC (Boone) | 1 | 79,900.00 | 79,900.00 | 79,900.00 | WT | Wind | 2011 | OP | 54 | IPP Non–CHP |
Laurel, City of | ||||||||||
–Laurel (Cedar) | 1 | 1,300.00 | 1,100.00 | 1,200.00 | IC | N/DFO | 1974 | SB | — | Electric |
2 | 900.00 | 700.00 | 800.00 | IC | N/DFO | 1970 | SB | — | Electric | |
7 | 1,300.00 | 1,100.00 | 1,200.00 | IC | N/DFO | 1992 | SB | — | Electric | |
Lexington | ||||||||||
–Net Metered Renewable Installations | 227.00 | 227.00 | 227.00 | NA | NA | 2021 | OP | — | Electric | |
Lincoln Electric System | ||||||||||
–J Street (Lancaster) | 1 | 27,000.00 | 29,300.00 | 31,700.00 | GT | DFO/N | 1972 | OP | — | Electric |
–Net Metered Renewable Installations | 1,320.00 | 1,320.00 | 1,320.00 | NA | NA | 2021 | OP | — | Electric | |
–Rokeby (Lancaster) | 1 | 72,400.00 | 70,500.00 | 72,000.00 | GT | N/DFO | 1975 | OP | — | Electric |
2 | 95,400.00 | 90,400.00 | 91,000.00 | GT | N/DFO | 1997 | OP | — | Electric | |
3 | 95,400.00 | 94,200.00 | 96,000.00 | GT | N/DFO | 2001 | OP | — | Electric | |
BSU | 2,900.00 | 3,200.00 | 3,200.00 | IC | DFO | 1997 | OP | — | Electric | |
–Salt Valley Wind Plant (Lancaster) | G1 | 600.00 | 700.00 | 700.00 | WT | Wind | 1998 | OP | 1 | Electric |
G2 | 600.00 | 700.00 | 700.00 | WT | Wind | 1999 | OP | 1 | Electric | |
–Terry Bundy Generating Station (Lancaster) | 1 | 28,200.00 | 27,300.00 | 28,600.00 | CA | N/DFO | 2004 | OP | — | Electric |
2 | 60,500.00 | 46,000.00 | 48,000.00 | CT | N/DFO | 2003 | OP | — | Electric | |
3 | 60,500.00 | 45,200.00 | 48,000.00 | CT | N/DFO | 2004 | OP | — | Electric | |
4 | 60,500.00 | 45,400.00 | 48,000.00 | GT | N/DFO | 2003 | OP | — | Electric | |
BSU | 1,800.00 | 1,600.00 | 1,600.00 | IC | DFO | 2004 | OP | — | Electric | |
LFG1 | 1,600.00 | 1,600.00 | 1,600.00 | IC | LFG | 2014 | OP | — | Electric | |
LFG2 | 1,600.00 | 1,600.00 | 1,600.00 | IC | LFG | 2014 | OP | — | Electric | |
LFG3 | 1,600.00 | 1,600.00 | 1,600.00 | IC | LFG | 2014 | OP | — | Electric | |
Little Blue Wind Project, LLC | ||||||||||
–Little Blue Wind Project, LLC (Webster) | WFW | 250,700.00 | 250,700.00 | 250,700.00 | WT | Wind | 2021 | OP | 87 | IPP Non–CHP |
Loup River Public Power District | ||||||||||
–Columbus (Platte) | 1 | 15,200.00 | 15,000.00 | 15,000.00 | HY | Water | 1936 | OP | — | Electric |
2 | 15,200.00 | 15,000.00 | 15,000.00 | HY | Water | 1936 | OP | — | Electric | |
3 | 15,200.00 | 15,000.00 | 15,000.00 | HY | Water | 1936 | OP | — | Electric | |
–Monroe (Platte) | 1 | 2,800.00 | 1,000.00 | 1,000.00 | HY | Water | 1936 | OP | — | Electric |
2 | 2,800.00 | 1,000.00 | 1,000.00 | HY | Water | 1936 | OP | — | Electric | |
3 | 2,800.00 | 1,000.00 | 1,000.00 | HY | Water | 1936 | OP | — | Electric | |
–Net Metered Renewable Installations | 533.80 | 533.80 | 533.80 | NA | NA | 2021 | OP | — | Electric | |
Lyons, City of | ||||||||||
–Lyons (Burt) | 2 | 500.00 | 200.00 | 200.00 | IC | DFO | 1953 | OP | — | Electric |
3 | 800.00 | 300.00 | 300.00 | IC | DFO | 1960 | OP | — | Electric | |
4A | 1,200.00 | 600.00 | 600.00 | IC | DFO | 1967 | OP | — | Electric | |
Madison, City of | ||||||||||
–Madison Utilities (Madison) | FM1 | 2,000.00 | 1,700.00 | 1,700.00 | IC | DFO/N | 1959 | OP | — | Electric |
FM2 | 1,300.00 | 1,000.00 | 1,000.00 | IC | DFO/N | 1959 | OP | — | Electric | |
FM3 | 1,100.00 | 900.00 | 900.00 | IC | DFO/N | 1953 | OP | — | Electric | |
FM5 | 1,400.00 | 1,000.00 | 1,000.00 | IC | DFO/N | 2006 | OP | — | Electric | |
McCook Public Power District | ||||||||||
–Net Metered Renewable Installations | 56.00 | 56.00 | 56.00 | NA | NA | 2021 | OP | — | Electric | |
Midwest Electric Membership Corp. | ||||||||||
–Net Metered Renewable Installations | 404.50 | 404.50 | 404.50 | NA | NA | 2021 | OP | — | Electric | |
Milligan 1 Wind, LLC | ||||||||||
–Milligan 1 Wind Farm (Saline) | SG275 | 99,000.00 | 99,000.00 | 99,000.00 | WT | Wind | 2020 | OP | 36 | IPP Non–CHP |
SG4.5 | 135,000.00 | 135,000.00 | 135,000.00 | WT | Wind | 2021 | OP | 30 | IPP Non–CHP | |
V110 | 66,000.00 | 66,000.00 | 66,000.00 | WT | Wind | 2020 | OP | 33 | IPP Non–CHP | |
Minden | ||||||||||
–Net Metered Renewable Installations | 27.74 | 27.74 | 27.74 | NA | NA | 2021 | OP | — | Electric | |
Nebraska City, City of | ||||||||||
–Nebraska City #1 (Otoe) | 2 | 1,500.00 | 1,000.00 | 1,000.00 | IC | DFO | 1953 | OP | — | Electric |
3 | 2,500.00 | 2,000.00 | 2,000.00 | IC | N/DFO | 1955 | OP | — | Electric | |
4 | 3,100.00 | 2,700.00 | 2,700.00 | IC | N/DFO | 1957 | OP | — | Electric | |
5 | 2,000.00 | 1,700.00 | 1,700.00 | IC | N/DFO | 1964 | OP | — | Electric | |
8 | 4,100.00 | 3,600.00 | 3,600.00 | IC | N/DFO | 1971 | OP | — | Electric | |
9 | 6,400.00 | 5,800.00 | 5,800.00 | IC | N/DFO | 1974 | OP | — | Electric | |
10 | 6,500.00 | 5,800.00 | 5,800.00 | IC | N/DFO | 1979 | OP | — | Electric | |
–Nebraska City #2 (Otoe) | 11 | 4,500.00 | 4,000.00 | 4,000.00 | IC | N/DFO | 1998 | OP | — | Electric |
12 | 4,500.00 | 4,000.00 | 4,000.00 | IC | N/DFO | 1998 | OP | — | Electric | |
13 | 4,500.00 | 4,200.00 | 4,200.00 | IC | DFO | 1998 | OP | — | Electric | |
–Net Metered Renewable Installations | 10.22 | 10.22 | 10.22 | NA | NA | 2021 | OP | — | Electric | |
–Syracuse #2 (Otoe) | 6 | 2,000.00 | 1,600.00 | 1,600.00 | IC | N/DFO | 1969 | OP | — | Electric |
7 | 2,000.00 | 1,600.00 | 1,600.00 | IC | N/DFO | 1970 | OP | — | Electric | |
Nebraska Public Power District | ||||||||||
–Ainsworth Wind (Brown) | 1 | 59,400.00 | 59,400.00 | 59,400.00 | WT | Wind | 2005 | OP | 36 | Electric |
–Beatrice (Gage) | CT1 | 76,600.00 | 69,000.00 | 69,000.00 | CT | N | 2005 | OP | — | Electric |
CT2 | 76,600.00 | 68,000.00 | 68,000.00 | CT | N | 2005 | OP | — | Electric | |
ST1 | 93,900.00 | 83,000.00 | 83,000.00 | CA | N | 2005 | OP | — | Electric | |
–Canaday (Gosper) | 1 | 108,800.00 | 99,300.00 | 99,300.00 | ST | N | 1958 | OP | — | Electric |
–Cooper Nuclear Station (Nemaha) | 1 | 801,000.00 | 770,000.00 | 770,000.00 | ST | Nuc | 1974 | OP | — | Electric |
–Gerald Gentlemen (Lincoln) | 1 | 681,300.00 | 665,000.00 | 665,000.00 | ST | S | 1979 | OP | — | Electric |
2 | 681,300.00 | 700,000.00 | 700,000.00 | ST | S | 1982 | OP | — | Electric | |
–Hallam (Lancaster) | 1 | 56,700.00 | 42,500.00 | 42,500.00 | GT | DFO/N | 1973 | OP | — | Electric |
–Hebron (Thayer) | 1 | 56,700.00 | 41,500.00 | 41,500.00 | GT | DFO | 1973 | OP | — | Electric |
–Kearney (Buffalo) | 1 | 1,500.00 | 1,000.00 | 1,000.00 | HY | Water | 1921 | OP | — | Electric |
–McCook (Red Willow) | 1 | 56,700.00 | 39,700.00 | 39,700.00 | GT | DFO | 1973 | OP | — | Electric |
–Mobile (York) | 1 | 1,000.00 | 1,000.00 | 1,000.00 | IC | DFO | 1980 | OP | — | Electric |
2 | 1,600.00 | 1,600.00 | 1,600.00 | IC | DFO | 1996 | OP | — | Electric | |
500 | 500.00 | 500.00 | 500.00 | IC | DFO | 1994 | OP | — | Electric | |
–Net Metered Renewable Installations | 1,618.00 | 1,618.00 | 1,618.00 | NA | NA | 2021 | OP | — | Electric | |
–North Platte (Lincoln) | 1 | 13,100.00 | 12,000.00 | 12,000.00 | HY | Water | 1935 | OP | — | Electric |
2 | 13,100.00 | 12,000.00 | 12,000.00 | HY | Water | 1935 | OP | — | Electric | |
–Sheldon (Lancaster) | 1 | 108,800.00 | 104,000.00 | 104,000.00 | ST | S | 1961 | OP | — | Electric |
2 | 119,900.00 | 115,000.00 | 115,000.00 | ST | S | 1965 | OP | — | Electric | |
Niobrara Valley Electric Membership | ||||||||||
–Net Metered Renewable Installations | 20.80 | 20.80 | 20.80 | NA | NA | 2021 | OP | — | Electric | |
Norris Public Power District | ||||||||||
–Net Metered Renewable Installations | 1,251.27 | 1,251.27 | 1,251.27 | NA | NA | 2021 | OP | — | Electric | |
North Central Public Power District | ||||||||||
–Net Metered Renewable Installations | 2.00 | 2.00 | 2.00 | NA | NA | 2021 | OP | — | Electric | |
–Plainview Municipal Power (Pierce) | 1 | 1,100.00 | 1,100.00 | 1,100.00 | IC | DFO | 1949 | OP | — | Electric |
3 | 900.00 | 900.00 | 900.00 | IC | DFO | 1958 | OP | — | Electric | |
4 | 1,200.00 | 1,200.00 | 1,200.00 | IC | DFO | 1963 | OP | — | Electric | |
5 | 1,800.00 | 1,800.00 | 1,800.00 | IC | DFO | 1999 | OP | — | Electric | |
North Platte, City of | ||||||||||
–Net Metered Renewable Installations | 17.40 | 17.40 | 17.40 | NA | NA | 2021 | OP | — | Electric | |
Northeast Nebraska Public Power District | ||||||||||
–Net Metered Renewable Installations | 157.00 | 157.00 | 157.00 | NA | NA | 2021 | OP | — | Electric | |
Northwest Rural Public Power District | ||||||||||
–Net Metered Renewable Installations | 197.70 | 197.70 | 197.70 | NA | NA | 2021 | OP | — | Electric | |
Omaha, City of | ||||||||||
–Missouri River Wastewater Treatment Plant (Douglas) | 6013 | 1,000.00 | 1,000.00 | 1,000.00 | IC | OBG/N | 2001 | OP | — | Commercial CHP |
6101 | 1,000.00 | 1,000.00 | 1,000.00 | IC | OBG/N | 1985 | OP | — | Commercial CHP | |
6102 | 1,000.00 | 1,000.00 | 1,000.00 | IC | OBG/N | 1985 | OP | — | Commercial CHP | |
–Papillion Creek Wastewater Treatment Plant (Sarpy) | 951 | 500.00 | 500.00 | 500.00 | IC | OBG/N | 1987 | OP | — | Commercial CHP |
952 | 500.00 | 500.00 | 500.00 | IC | OBG/N | 1987 | OP | — | Commercial CHP | |
953 | 500.00 | 500.00 | 500.00 | IC | OBG/N | 1987 | OP | — | Commercial CHP | |
Omaha Public Power District | ||||||||||
–Cass County (Cass) | CT–1 | 172,500.00 | 162,000.00 | 136,100 | GT | N | 2003 | OP | — | Electric |
CT–2 | 172,500.00 | 161,800.00 | 134,200 | GT | N | 2003 | OP | — | Electric | |
–Elk City Station (Douglas) | 1 | 800.00 | 800.00 | 800.00 | IC | LFG | 2002 | OP | — | Electric |
2 | 800.00 | 800.00 | 800.00 | IC | LFG | 2002 | OP | — | Electric | |
3 | 800.00 | 800.00 | 800.00 | IC | LFG | 2002 | OP | — | Electric | |
4 | 800.00 | 800.00 | 800.00 | IC | LFG | 2002 | OP | — | Electric | |
5 | 800.00 | 800.00 | 800.00 | IC | LFG | 2006 | OP | — | Electric | |
6 | 800.00 | 700.00 | 700.00 | IC | LFG | 2006 | OP | — | Electric | |
7 | 800.00 | 700.00 | 700.00 | IC | LFG | 2006 | OP | — | Electric | |
8 | 800.00 | 800.00 | 800.00 | IC | LFG | 2009 | OP | — | Electric | |
–Jones Street (Douglas) | 1 | 65,000.00 | 61,200.00 | 61,200.00 | GT | DFO | 1973 | OP | — | Electric |
2 | 65,000.00 | 62,200.00 | 62,200.00 | GT | DFO | 1973 | OP | — | Electric | |
–Nebraska City (Otoe) | 1 | 651,600.00 | 654,300.00 | 654,300.00 | ST | S | 1979 | OP | — | Electric |
2 | 738,000.00 | 691,000.00 | 691,000.00 | ST | S | 2009 | OP | — | Electric | |
–Net Metered Renewable Installations | 1,482.00 | 1,482.00 | 1,482.00 | NA | NA | 2021 | OP | — | Electric | |
–North Omaha (Douglas) | 1 | 73,500.00 | 64,800.00 | NA | ST | N | 1954 | OP | — | Electric |
2 | 108,800.00 | 90,800.00 | NA | ST | N | 1957 | OP | — | Electric | |
3 | 108,800.00 | 86,000.00 | 41,400.00 | ST | N | 1959 | OP | — | Electric | |
4 | 136,000.00 | 120,100.00 | 101,800.00 | ST | S/N | 1963 | OP | — | Electric | |
5 | 217,600.00 | 216,200.00 | 174,900.00 | ST | S/N | 1968 | OP | — | Electric | |
–Sarpy County (Sarpy) | 1 | 55,400.00 | 55,400.00 | 55,400.00 | GT | N/DFO | 1972 | OP | — | Electric |
2 | 55,400.00 | 55,900.00 | 55,900.00 | GT | N/DFO | 1972 | OP | — | Electric | |
3 | 106,300.00 | 107,800.00 | 107,800.00 | GT | N/DFO | 1996 | OP | — | Electric | |
4 | 58,900.00 | 48,700.00 | 48,700.00 | GT | N/DFO | 2000 | OP | — | Electric | |
5 | 58,900.00 | 47,900.00 | 47,900.00 | GT | N/DFO | 2000 | OP | — | Electric | |
BSD | 3,500.00 | 3,400.00 | 3,400.00 | IC | DFO | 1996 | SB | — | Electric | |
Ord, City of | ||||||||||
–Ord (Valley) | 1 | 5,000.00 | 5,000.00 | 5,000.00 | IC | DFO/N | 1973 | OP | — | Electric |
2 | 1,500.00 | 1,000.00 | 1,000.00 | IC | DFO/N | 1966 | OP | — | Electric | |
3 | 2,500.00 | 2,000.00 | 2,000.00 | IC | DFO/N | 1963 | OP | — | Electric | |
4A | 1,500.00 | 1,400.00 | 1,400.00 | IC | DFO | 1997 | OP | — | Electric | |
5A | 1,500.00 | 1,400.00 | 1,400.00 | IC | DFO | 1997 | OP | — | Electric | |
–Net Metered Renewable Installations | 25.00 | 25.00 | 25.00 | NA | NA | 2021 | OP | — | Electric | |
Oxford, Village of | ||||||||||
–Oxford (Furnas) | 2 | 600.00 | 500.00 | 600.00 | IC | N/DFO | 1953 | OP | — | Electric |
3 | 900.00 | 800.00 | 900.00 | IC | N/DFO | 1956 | OP | — | Electric | |
4 | 600.00 | 500.00 | 600.00 | IC | N/DFO | 1956 | OP | — | Electric | |
5 | 1,300.00 | 1,200.00 | 1,300.00 | IC | N/DFO | 1972 | OP | — | Electric | |
Panhandle Rural Electric Association Membership | ||||||||||
–Net Metered Renewable Installations | 160.00 | 160.00 | 160.00 | NA | NA | 2021 | OP | — | Electric | |
Pender, City of | ||||||||||
–Pender (Thurston) | 1 | 1,500.00 | 1,200.00 | 1,200.00 | IC | DFO/N | 1968 | OP | — | Electric |
2 | 2,000.00 | 2,000.00 | 2,000.00 | IC | DFO/N | 1973 | OP | — | Electric | |
3 | 500.00 | 500.00 | 500.00 | IC | DFO/N | 1953 | OP | — | Electric | |
4 | 900.00 | 800.00 | 800.00 | IC | DFO/N | 1961 | OP | — | Electric | |
Perennial Public Power District | ||||||||||
–Net Metered Renewable Installations | 173.46 | 173.46 | 173.46 | NA | NA | 2021 | OP | — | Electric | |
Perennial Wind, LLC | ||||||||||
–Perennial Windfarm (Fillmore) | T–1 | 2,300.00 | 2,300.00 | 2,300.00 | WT | Wind | 2018 | OP | 1 | IPP Non–CHP |
T–2 | 2,300.00 | 2,300.00 | 2,300.00 | WT | Wind | 2018 | OP | 1 | IPP Non–CHP | |
T–3 | 2,300.00 | 2,300.00 | 2,300.00 | WT | Wind | 2018 | OP | 1 | IPP Non–CHP | |
Pierce | ||||||||||
–Net Metered Renewable Installations | 6.20 | 6.20 | 6.20 | NA | NA | 2021 | OP | — | Electric | |
Plum Creek Wind, LLC | ||||||||||
–Plum Creek Wind Project (NE) (Wayne) | PLUM | 230,000.00 | 230,000.00 | 230,000.00 | WT | Wind | 2020 | OP | 82 | IPP Non–CHP |
Polk County Renewables, LLC | ||||||||||
–Polk County Renewables, LLC (Polk) | T–1 | 2,500.00 | 2,500.00 | 2,500.00 | WT | Wind | 2018 | OP | 1 | IPP Non–CHP |
Polk County Rural Public Power District | ||||||||||
–Net Metered Renewable Installations | 59.00 | 59.00 | 59.00 | NA | NA | 2021 | OP | — | Electric | |
Rattlesnake Creek Wind Project, LLC | ||||||||||
–Rattlesnake Creek Wind Project (Dixon) | RCWP | 318,100.00 | 318,100.00 | 318,100.00 | WT | Wind | 2019 | OP | 101 | IPP Non–CHP |
Red Cloud, City of | ||||||||||
–Red Cloud (Webster) | 2 | 900.00 | 600.00 | 600.00 | IC | DFO | 1953 | OP | — | Electric |
3 | 1,300.00 | 1,200.00 | 1,200.00 | IC | DFO | 1960 | OP | — | Electric | |
4 | 1,300.00 | 1,200.00 | 1,200.00 | IC | DFO | 1968 | OP | — | Electric | |
5 | 2,200.00 | 2,200.00 | 2,200.00 | IC | DFO | 1973 | OP | — | Electric | |
Roosevelt Public Power District | ||||||||||
–Net Metered Renewable Installations | 93.20 | 93.20 | 93.20 | NA | NA | 2021 | OP | — | Electric | |
Sargent, City of | ||||||||||
–Sargent (Custer) | 1 | 1,100.00 | 1,100.00 | 1,100.00 | IC | DFO/N | 1968 | OP | — | Electric |
3 | 900.00 | 900.00 | 900.00 | IC | DFO/N | 1964 | OP | — | Electric | |
4 | 400.00 | 400.00 | 400.00 | IC | DFO/N | 1954 | OP | — | Electric | |
Schuyler | ||||||||||
–Net Metered Renewable Installations | 10.00 | 10.00 | 10.00 | NA | NA | 2021 | OP | — | Electric | |
Scribner, City of | ||||||||||
–Scribner Diesel Generation Facility (Dodge) | 1 | 2,000.00 | 2,000.00 | 2,000.00 | IC | DFO/OBL | 2020 | OP | — | Electric |
2 | 2,000.00 | 2,000.00 | 2,000.00 | IC | DFO/OBL | 2020 | OP | — | Electric | |
Seward, City of | ||||||||||
–Net Metered Renewable Installations | 24.00 | 24.00 | 24.00 | NA | NA | 2021 | OP | — | Electric | |
Seward Wind LLC | ||||||||||
–Seward Wind Farm (Seward) | T1 | 1,700.00 | 1,700.00 | 1,700.00 | WT | Wind | 2017 | OP | 1 | IPP Non–CHP |
Sholes Wind Energy Center, LLC | ||||||||||
–Sholes Wind Energy Center (Wayne) | WSN1 | 160,000.00 | 160,000.00 | 160,000.00 | WT | Wind | 2019 | OP | 71 | IPP Non–CHP |
Sidney, City of | ||||||||||
–Sidney (Cheyenne) | 1 | 1,200.00 | 1,000.00 | 1,100.00 | IC | N/DFO | 1949 | OP | — | Electric |
3 | 800.00 | 600.00 | 600.00 | IC | DFO | 1931 | OP | — | Electric | |
5 | 3,100.00 | 2,500.00 | 2,500.00 | IC | N/DFO | 1955 | OP | — | Electric | |
–Net Metered Renewable Installations | 25.50 | 25.50 | 25.50 | NA | NA | 2021 | OP | — | Electric | |
SoCore Energy LLC | ||||||||||
–Kearney NPPD Solar Project (Buffalo) | PV1 | 5,800.00 | 5,800.00 | 5,800.00 | PV | SUN | 2017 | OP | — | IPP Non–CHP |
Sol Systems | ||||||||||
–Airport 009239 SCS Lexington, LLC (Dawson) | 20215 | 1,000.00 | 1,000.00 | 1,000.00 | PV | SUN | 2021 | OP | — | IPP Non–CHP |
–Monroe 009452 SCS Cozad, LLC (Dawson) | 20214 | 2,000.00 | 2,000.00 | 2,000.00 | PV | SUN | 2021 | OP | — | IPP Non–CHP |
–Western Meadownlark Solar SCS NE 1, LLC (Scotts Bluff) | 30003 | 4,400.00 | 4,400.00 | 4,400.00 | PV | SUN | 2020 | OP | — | IPP Non–CHP |
South Central Public Power District | ||||||||||
–Net Metered Renewable Installations | 38.00 | 38.00 | 38.00 | NA | NA | 2021 | OP | — | Electric | |
South Sioux City, City of | ||||||||||
–Net Metered Renewable Installations | 4.50 | 4.50 | 4.50 | NA | NA | 2021 | OP | — | Electric | |
Southern Public Power District | ||||||||||
–Net Metered Renewable Installations | 344.00 | 344.00 | 344.00 | NA | NA | 2021 | OP | — | Electric | |
Southwest Public Power District | ||||||||||
–Net Metered Renewable Installations | 24.54 | 24.54 | 24.54 | NA | NA | 2021 | OP | — | Electric | |
Spalding, Village of | ||||||||||
–Spalding (Greeley) | 1 | 100.00 | 100.00 | 100.00 | HY | Water | 1919 | OP | — | Electric |
2 | 100.00 | 100.00 | 100.00 | HY | Water | 1956 | OP | — | Electric | |
4 | 200.00 | 200.00 | 200.00 | IC | DFO | 1947 | SB | — | Electric | |
5 | 400.00 | 400.00 | 400.00 | IC | DFO | 1959 | SB | — | Electric | |
6 | 1,300.00 | 1,300.00 | 1,300.00 | IC | DFO | 1975 | SB | — | Electric | |
St. Paul | ||||||||||
–Net Metered Renewable Installations | 3.00 | 3.00 | 3.00 | NA | NA | 2021 | OP | — | Electric | |
Stanton County Public Power District | ||||||||||
–Net Metered Renewable Installations | 32.00 | 32.00 | 32.00 | NA | NA | 2021 | OP | — | Electric | |
Steele Flats Wind Project LLC | ||||||||||
–Steele Flats Wind Project LLC (Jefferson) | 1 | 74,800 | 74,800 | 74,800 | WT | Wind | 2013 | OP | 44 | IPP Non–CHP |
Stuart, City of | ||||||||||
–Stuart (Holt) | 1 | 700.00 | 700.00 | 700.00 | IC | N/DFO | 1952 | OP | — | Electric |
2 | 200.00 | 200.00 | 200.00 | IC | DFO | 1960 | SB | — | Electric | |
3 | 200.00 | 200.00 | 200.00 | IC | DFO | 1952 | SB | — | Electric | |
5 | 800.00 | 800.00 | 800.00 | IC | DFO | 1997 | OP | — | Electric | |
SunEdison LLC | ||||||||||
–Prairie Breeze (Antelope) | 1 | 206,500.00 | 200,600.00 | 200,600.00 | WT | Wind | 2014 | OP | 118 | IPP Non–CHP |
Superior | ||||||||||
–Net Metered Renewable Installations | 22.40 | 22.40 | 22.40 | NA | NA | 2021 | OP | — | Electric | |
Tecumseh, City of | ||||||||||
–Tecumseh (Johnson) | 1 | 700.00 | 600.00 | 600.00 | IC | N/DFO | 1948 | OP | — | Electric |
2 | 1,500.00 | 1,400.00 | 1,400.00 | IC | N/DFO | 1968 | OP | — | Electric | |
3 | 1,100.00 | 1,000.00 | 1,000.00 | IC | N/DFO | 1953 | OP | — | Electric | |
4 | 1,300.00 | 1,200.00 | 1,200.00 | IC | N/DFO | 1960 | OP | — | Electric | |
5A | 2,400.00 | 2,400.00 | 2,400.00 | IC | N/DFO | 1993 | OP | — | Electric | |
Tesla Inc. | ||||||||||
–South Sioux City Solar (Dakota) | PV1 | 2,300 | 2,300 | 2,300 | PV | SUN | 2016 | OP | IPP Non–CHP | |
TPW Petersburg LLC | ||||||||||
–TPW Petersburg (Boone) | PETE | 40,500.00 | 40,500.00 | 40,500.00 | WT | Wind | 2011 | OP | 27 | IPP Non–CHP |
Twin Valley Public Power District | ||||||||||
–Net Metered Renewable Installations | 44.70 | 44.70 | 44.70 | NA | NA | 2021 | OP | — | Electric | |
USACE-Omaha | ||||||||||
–Gavins Point (Cedar) | 1 | 44,100.00 | 34,000.00 | 34,000.00 | HY | Water | 1956 | OP | — | Electric |
2 | 44,100.00 | 34,000.00 | 34,000.00 | HY | Water | 1956 | OP | — | Electric | |
3 | 44,100.00 | 34,000.00 | 34,000.00 | HY | Water | 1957 | OP | — | Electric | |
Valentine Wind, LLC | ||||||||||
–Valentine Wind, LLC (Cherry) | 7772 | 1,900.00 | 1,900.00 | 1,900.00 | WT | Wind | 2014 | OP | 1 | IPP Non–CHP |
Wahoo, City of | ||||||||||
–Net Metered Renewable Installations | 10.00 | 10.00 | 10.00 | NA | NA | 2021 | OP | — | Electric | |
–Wahoo (Saunders) | 1 | 2,500.00 | 2,100.00 | 2,100.00 | IC | N/DFO | 1960 | OP | — | Electric |
2 | 500.00 | 400.00 | 400.00 | IC | DFO | 1936 | OP | — | Electric | |
3 | 4,400.00 | 4,400.00 | 4,400.00 | IC | N/DFO | 1973 | OP | — | Electric | |
4 | 1,200.00 | 1,100.00 | 1,100.00 | IC | N/DFO | 1947 | OP | — | Electric | |
5 | 2,100.00 | 2,200.00 | 2,200.00 | IC | N/DFO | 1952 | OP | — | Electric | |
6 | 3,500.00 | 3,400.00 | 3,400.00 | IC | N/DFO | 1969 | OP | — | Electric | |
Wakefield, City of | ||||||||||
–Wakefield (Dixon) | 2 | 600.00 | 500.00 | 500.00 | IC | DFO/N | 1915 | OP | — | Electric |
5 | 1,300.00 | 1,000.00 | 1,000.00 | IC | DFO/N | 1966 | OP | — | Electric | |
6 | 1,300.00 | 1,100.00 | 1,100.00 | IC | DFO/N | 1971 | OP | — | Electric | |
IC4 | 900.00 | 600.00 | 600.00 | IC | DFO/N | 1961 | OP | — | Electric | |
Walthill | ||||||||||
–Net Metered Renewable Installations | 70.00 | 70.00 | 70.00 | NA | NA | 2021 | OP | — | Electric | |
Wauneta | ||||||||||
–Net Metered Renewable Installations | 5.70 | 5.70 | 5.70 | NA | NA | 2021 | OP | — | Electric | |
Wayne, City of | ||||||||||
–Wayne (Wayne) | 1 | 1,300.00 | 800.00 | 800.00 | IC | DFO | 1951 | OP | — | Electric |
2 | 1,000.00 | 900.00 | 900.00 | IC | DFO | 1947 | SB | — | Electric | |
3 | 1,900.00 | 1,800.00 | 1,800.00 | IC | DFO | 1956 | OP | — | Electric | |
4 | 2,000.00 | 1,900.00 | 1,900.00 | IC | DFO | 1960 | OP | — | Electric | |
5 | 3,500.00 | 3,300.00 | 3,300.00 | IC | DFO | 1966 | OP | — | Electric | |
6 | 5,100.00 | 4,900.00 | 4,900.00 | IC | DFO | 1968 | OP | — | Electric | |
7 | 3,500.00 | 3,300.00 | 3,300.00 | IC | DFO | 1998 | OP | — | Electric | |
8 | 3,500.00 | 3,300.00 | 3,300.00 | IC | DFO | 1998 | OP | — | Electric | |
West Point, City of | ||||||||||
–Net Metered Renewable Installations | 58.32 | 58.32 | 58.32 | NA | NA | 2021 | OP | — | Electric | |
–West Point Municipal (Cuming) | 2 | 900.00 | 900.00 | 900.00 | IC | DFO/N | 1947 | OP | — | Electric |
3 | 1,200.00 | 1,200.00 | 1,200.00 | IC | DFO/N | 1959 | OP | — | Electric | |
4 | 2,300.00 | 2,300.00 | 2,300.00 | IC | DFO/N | 1965 | OP | — | Electric | |
Western Sugar Cooperative | ||||||||||
–Western Sugar Coop - Scottsbluff (Scotts Bluff) | SCBF | 5,000.00 | 5,000.00 | 5,000.00 | ST | S | 1987 | OP | — | Industrial CHP |
Wheatbelt Public Power District | ||||||||||
–Net Metered Renewable Installations | 182.00 | 182.00 | 182.00 | NA | NA | 2021 | OP | — | Electric | |
Wilber, City of | ||||||||||
–Wilber (Saline) | 4 | 1,100.00 | 900.00 | 900.00 | IC | DFO | 1960 | OP | — | Electric |
5 | 900.00 | 600.00 | 600.00 | IC | DFO | 1960 | OP | — | Electric | |
6 | 1,600.00 | 1,600.00 | 1,600.00 | IC | DFO | 1997 | OP | — | Electric | |
Wisner, City of | ||||||||||
–Wisner (Cuming) | 3 | 800.00 | 800.00 | 800.00 | IC | DFO | 1969 | OP | — | Electric |
4 | 1,500.00 | 1,500.00 | 1,500.00 | IC | DFO | 2010 | OP | — | Electric | |
5 | 1,500.00 | 1,500.00 | 1,500.00 | IC | DFO | 2010 | OP | — | Electric | |
Wyrulec Company | ||||||||||
–Net Metered Renewable Installations | 45.00 | 45.00 | 45.00 | NA | NA | 2021 | OP | — | Electric |
Sources: "Annual Electric Generator Data", Survey Form EIA–860, Energy Information Administration, Washington, DC. "Net Metering Report", Nebraska Power Review Board, Lincoln, NE. Nebraska Department of Environment and Energy, Lincoln, NE.
Notes–
Prime Mover:
BA = Energy Storage, Battery
BT = Turbines used in a binary cycle (such as used for geothermal applications)
CA = Combined cycle steam part
CC = Combined cycle total unit (used only for plants/generators that are in planning stage, for which specific generator details cannot be provided)
CE = Compressed air energy storage
CS = Combined cycle single shaft (combustion turbine and steam turbine share a single generator)
CT = Combined cycle combustion turbine part (type of coal or solid must be reported as energy source for integrated coal gasification)
FC = Fuel cell
GT = Combustion (gas) turbine – simple cycle (includes jet engine design)
HY = Hydraulic turbine (includes turbines associated with delivery of water by pipeline)
IC = Internal combustion engine (diesel, piston, reciprocating)
OT = Other
PS = Hydraulic turbine – reversible (pumped storage)
PV = Photovoltaic
ST = Steam turbine, including nuclear, geothermal, and solar steam (does not include combined cycle)
WT = Wind turbine
Energy Source: The first word or abbreviation is the primary energy source. The second word or abbreviation is the alternate energy source.
AB = Agricultural crop byproducts/straw/energy crops
BFG = Blast furnace gas
Bit = Anthracite coal and bituminous coal
BLQ = Black liquor
DFO = Distillate fuel oil including diesel, No. 1, No. 2, and No. 4 fuel oils
GEO = Geothermal
JF = Jet fuel
KER = Kerosene
LFG = Landfill gas
Lig = Lignite coal
MSW = Municipal solid waste
MWH = Energy storage technologies, such as compressed air, batteries, and fly wheels
N = Natural Gas
Nuc = Nuclear including Uranium, Plutonium, Thorium
OBG = Other biomass gas including digestor gas, methane, other biomass gases
OBL = Other biomass liquids (ethanol, fish oil, liquid acetonitrile waste, medical waste, tall oil, waste alcohol, and other biomass not specified)
OBS = Other biomass solids (animal manure and waste, solid byproducts, and other solid biomass not specified)
OG = Other gas (butane, coal processes, coke–oven, refinery, and other processes)
OTH = Other (batteries, chemicals, coke breeze, hydrogen, pitch, sulfur, tar coal, and miscellaneous technologies)
PC = Petroleum coke
PG = Gaseous propane
PUR = Purchased steam
RFO = Residual fuel oil (including No. 5 and No. 6 fuel oils and Bunker C fuel oil)
S = Subbituminous coal
SC = Coal synfuel. Coal–based solid fuel that has been processed by a coal synfuel plant; and coal–based fuels such as briquettes, pellets, or extrusions, which are formed from fresh or recycled coal and binding materials.
SG = Synthetic gas, other than coal–derived.
SGC = Synthetic gas derived from coal.
SLW = Sludge waste
SUN = Solar (photovoltaic, thermal)
TDF = Tire–derived fuels
Water = Water at a conventional hydroelectric turbine.
WC = Waste/other coal including anthracite culm, bituminous gob, fine coal, lignite waste, and waste coal.
WDL = Wood waste liquids excluding black liquor, including red liquor, sludge wood, spent sulfite liquor, and other wood–based liquids)
WDS = Wood/wood waste solids including paper pellets, railroad ties, utility poles, wood chips, bark, and wood waste solids.
WH = Waste heat not directly attributed to an energy source. WH should only be reported where the energy source for the waste heat is undetermined.
Wind = Wind
WO = Waste/other oil including crude oil, liquid butane, liquid propane, oil waste, re–refined motor oil, sludge oil, tar oil, or other petroleum–based liquid wastes.
Unit Status:
OA = Out of service – was not used for some or all of the reporting period but was either returned to service on December 31 or will be returned to service in the next calendar year.
OP = Operating – in service (commercial operation) and producing some electricity. Includes peaking units that are run on an as–needed intermittent or seasonal) basis.
OS = Out of service – was not used for some or all of the reporting period and is NOT expected to be returned to service in the next calendar year.
SB = Standby/Backup – available for service but not normally used (has little or no generation during the year) for this reporting period.
Number of Wind Turbines:
A dash (—) indicates not applicable.
Sector (Primary purpose, regulatory status, and plant–level combined heat and power status):
Commercial CHP = Commercial, Combined Heat and Power.
Industrial CHP = Industrial, Combined Heat and Power.
Industrial Non–CHP = Industrial, Non–Combined Heat and Power.
IPP = Independent Power Producer.
IPP CHP = Independent Power Producer, Combined Heat and Power.
IPP Non–CHP = Independent Power Producer, Non–Combined Heat and Power.